PLATE
The flaw had been present in the steel plate prior to being welded when the tank was originally built. (W 197) (1)
Steel plate = Chapa de aço
The welding sequence begins when the hot plate, at a preset temperature, is positioned between the two pipe ends. (W 232) (2)
Hot plate = Placa de aquecimento / aquecida
Close fit-up between the stiffeners and the base plate was maintained during tack welding using the pneumatic bridging clamps. (W 189) (3)
Base plate = Placa de base
(1) Evaluation of CrackFirst TM fatigue sensors
Yan H Zhang*, Peter J Tubby*, Chris Allen*, and Jagath Mawella**
* TWI Granta Park, Great Abington, Cambridge CB1 6AL, UK
** Defence Equipment and Support, Ministry of Defence, Abbeywood, Bristol BS34 8JH, UK
Paper presented at 2007 CF/DRDC International Defence Applications of Materials meeting, Halifax, Canada, 5-7 June 2007.
(2) Welding and testing of thermoplastics tanks and pipes
Mike Troughton BSc PhD CPhys MinstP
Paper presented at Non-metallic pressure equipment seminar, 5 June 2006, London, I Mech E.
(3) Laser and hybrid laser-MAG welding of steel structures for shipbuilding
Steve Shi and David Howse
Laser & Sheet Processes Group, TWI Ltd
Paper presented at 2007 International Forum on Welding Technologies in Shipping Industry held in Shanghai on 16-18 June 2007.