INSPECTION
Ultrasonic inspection of dissimilar joints is receiving much attention at TWI. (W 22) (1)
Ultrasonic inspection = Inspeção ultra-sônica
The second phase involves comprehensive plant-wide implementation of risk-based inspection and maintenance (RBI) planning tools. (W 100) (2)
Risk-based inspection = Inspeção baseada em risco
In one company visited by TWI, a person was found performing magnetic-particle inspection on a steel framework component for a fork lift truck. The person appeared to be using appropriate techniques but on questioning him it was found that he had been shown what to do by a colleague and did not know anything about the principles of the NDT method he was using. (W 82) (3)
Magnetic-particle inspection = Inspeção de partículas magnéticas
(1) Review of type IV cracking of weldments in 9– 12%Cr creep strength enhanced ferritic steels.
D.J. Abson and J. S. Rothwell*
TWI Ltd
International Materials Reviews, November 2013, 58(8), 437-473.
(2) Operational excellence through an Asset Maintenance Optimisation System
Dr Brian J Cane CEng FIMMM
Paper presented at NACE 13th Middle East Corrosion Conference, Kingdom of Bahrain, 14 – 17 February 2010.
(3) The special importance of personnel competence in welding fabrication
Importance particuliere de la competence des personnels dans la fabrication soudee
Eur Ing T. J. Jessop and Eur Ing C. J. Eady
TWI Ltd
Paper presented at European Symposium on Pressure Equipment, ESOPE 2010. Paris, 28 – 30 Sept. 2010.